Why remodel your shower
Replace the problems you see—and the ones you cannot
Cracked or stained surfaces, failing grout, mold-prone caulk, and an enclosure that no longer works well can all signal that your shower needs more than another cleaning. A TimeLock shower remodel replaces the existing shower with a seamless system designed for simpler upkeep and a refreshed, coordinated look.
Seamless wall surrounds
Grout-free wall surrounds reduce the grout lines where mold and mildew commonly take hold, making everyday cleaning easier.
Enclosure choices
Choose from sliding, barn-style, or pivot doors, with hardware and accessories selected to suit your space and routine.
Low-maintenance materials
TimeLock Bath & Shower Systems are designed as a low-maintenance alternative to a worn tile-and-grout shower.
Design your shower
Finishes that make the space yours
TimeLock shower wall surrounds are available in solid colors such as Almond, Biscuit, Gray, and Sandbar, along with stone and marble finishes, laser-etched tile patterns, the PuroStone Collection, and simulated tile patterns with a grout-free look. Options include styles such as Herringbone, Subway, Chevron, Coastal Mist, and Marbled Ash, subject to the selections available for your project.
What your project can include
Build a shower around your bathroom
Your shower remodel can combine the wall design, enclosure, and accessories that make sense for your room. The project scope is shaped around the existing space and the features you want to use every day.
Before installation
Start with a clear look at your existing shower
Before replacement options are discussed, the existing bath and shower space can be examined for moisture, grout failure, and signs of mold. Measurements and available design options help clarify what can fit your bathroom, from wall pattern and door style to hardware and accessories. A free in-home consultation can bring samples and design choices into your home so you can evaluate them in the space.
Shower remodeling FAQs
Common Questions About Shower Remodeling
How long does a shower remodel take?
Most shower replacements are completed in as little as 2 days, start to finish, according to the supplied service information.
Can I choose the wall finish and door style?
Yes. You can choose from multiple wall colors, stone and marble finishes, laser-etched and simulated tile patterns, plus sliding, barn-style, or pivot doors. Hardware and accessories are also available in a range of options.
What does the existing shower inspection check for?
The inspection looks for moisture behind the walls, grout failure, and signs of mold before replacement options are discussed. Measurements help determine which system and features fit the space.
Limited Time Offer